h o m e p a g e


Town planning situation


                       


Stage 1
1
st stage of the intervention

Area reserved for industrial installation 201.860
Index of land covering 0.33 %
Index of the volume 2.00 Mtr./Mq.
Allocated plots 80% (approx.)
Vacant plots 20%

Stage 2
2
nd stage of the intervention

 

 

A

B

C

Whole area

272.612 Mtr.

361.804 Mtr.

476.597 Mtr.

Index of land covering

0.33%

0.33%

0.33%

Index of the volume

2.50 Mtr./Mq.

2.50 Mtr./Mq.

2.50 Mtr./Mq.

Allocated plots

50% (approx.)

 

 

 

 

Vacant plots

50%

100%

100%

Existing mains services


Water

Drinking water

Non-drinking water


Sewage works

Fresh water

Sewage


Electricity

Connection to the plot


Distances from port and airport


Olbia’ s port 50 Km. Motorway (4 lanes)


Olbia’ s airport 50 km. Motorway (4 lanes)


La Caletta’ s port 5 km.


Available manpower


Trained or trainable workers are available


                       


The Consortium - About us - Investing in Siniscola - The territory
Incentives - Town planning - Regulations - Territorial map - Link

                    m a i l u s