Stage 1
1st stage of
the intervention
Area reserved for industrial
installation 201.860
Index of land covering 0.33 %
Index of the volume 2.00 Mtr./Mq.
Allocated plots 80% (approx.)
Vacant plots 20%
Stage 2
2nd stage of
the intervention
|
A
|
B
|
C
|
Whole
area
|
272.612
Mtr.
|
361.804
Mtr.
|
476.597
Mtr.
|
Index
of land covering
|
0.33%
|
0.33%
|
0.33%
|
Index
of the volume
|
2.50
Mtr./Mq.
|
2.50
Mtr./Mq.
|
2.50
Mtr./Mq.
|
Allocated
plots
|
50%
(approx.)
|
|
|
Vacant
plots
|
50%
|
100%
|
100%
|
Existing mains services
Water
Drinking water
Non-drinking water
Sewage works
Fresh water
Sewage
Electricity
Connection to the plot
Distances from port and airport
Olbia s port 50 Km. Motorway (4 lanes)
Olbia s airport 50 km. Motorway (4 lanes)
La Caletta s port 5 km.
Available manpower
Trained or trainable workers are available
|